浅谈预应力锚索在泰安抽水蓄能电站的应用 被引量:1

The Application of the Pre-stressed Anchorage Cable in Tai'an Pumped Storage Hydropower Station
下载PDF
导出
摘要 泰安抽水蓄能电站左坝头边坡存在较大安全隐患,设计采用无粘结预应力锚索进行加固处理。预应力锚索施工技术主要包括钢铰线、张拉机具选取,灌浆工艺,张拉工艺,端部封堵等。施工过程中严格质量控制,坚持安全施工,圆满完成任务。 Since big hidden troubles exist in the side-slope of the left-bank of Tai'an Pumped Storage Hydropower Station, pre-stressed anchorage cables without adhesive bond end socket have been adopted for the purpose of reinforcement. The construction technology of the pre-stressed anchorage cable mainly include steel cable, choice of pulling implement, grouting technology, pulling technology, head end plugging, etc. With safety in mind, the quality has been strictly supervised in the process of construction.
出处 《水力发电》 北大核心 2006年第4期43-45,共3页 Water Power
关键词 预应力锚索 无粘结端头锚 施工工艺 泰安抽水蓄能电站 the pre-stressed anchorage cable anchorage cable without adhesive bond end socket construction technology Tai' an Pumped Storage Hydropower Station
  • 相关文献

参考文献1

二级参考文献2

  • 1杨喜乐,孟全国.开塞露灌肠治疗产后尿潴留180例护理体会[J]中国实用护理杂志,1993(06).
  • 2王永琦.预防拔除留置尿管后尿潴留的点滴经验[J]中华护理杂志,1992(02).

共引文献143

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部