摘要
介绍了长珲公路的工程及地质概况、压力分散型预应力锚索在该工程中的应用、作用机理、施工工艺及张拉实验。
The general conditions of engineering and geology of Chang- Hun Highway were introduced. The application of compression decentralized pre-stressed cables, their functions, the reaction mechanism, operation techniques and tension test were also introduced.
出处
《探矿工程(岩土钻掘工程)》
2006年第4期35-37,共3页
Exploration Engineering:Rock & Soil Drilling and Tunneling
关键词
压力分散型
预应力锚索
边坡加固
compression decentralized
pre-stressed anchor cable
slop reinforcement