夹坑隧道右洞软弱偏压地质段施工 被引量:4

Construction of Uneven Pressured Portion of Right Tube of Jiakeng Tunnel Located in Soft Ground
下载PDF
导出
摘要 夹坑隧道右洞进口位于软弱、偏压不良地质地段,施工过程中明洞地段发生了坍方,并影响到暗洞的施工。根据现场的地质情况,及时调整设计方案,对隧道地表进行导管注浆加固,并对暗洞支护措施进行了相应调整,增加了防偏压措施,顺利通过了软弱、偏压地段。对设计、施工措施及施工工艺、方法作了较为详细的介绍。 The entrance portion of the right tube of Jiakeng tunnel is located in soft ground with uneven pressure. During the construction of the tunnel, collapses occur at the open tunnel, which imposes impact on the construction of the underground tunnel. On basis of the geological conditions of the tunnel, the design proposals are timely adjusted, consolidation grouting is conducted from the ground surface, the reinforcement measures for the underground tunnel are adjusted and additional measures against the uneven pressure are taken, so that the construction of the tunnel portion in soft ground with uneven pressure is accomplished successfully. The article presents a detailed description of the design and construction of the tunnel.
出处 《隧道建设》 2006年第2期65-67,共3页 Tunnel Construction
关键词 隧道 软弱 偏压 施工 tunnel soft ground uneven pressure construction
  • 相关文献

参考文献1

  • 1JTG D70-2004.公路隧道设计规范[S],2004.

同被引文献26

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部