昆仑山隧道特浅埋段施工技术 被引量:2

Construction Technology of Ultra-shallow-buried Portion of Kunlunshan Tunnel
下载PDF
导出
摘要 通过青藏铁路上第一个控制工程———昆仑山隧道的特浅埋段DK977+600^+660的施工过程,阐述了地表注浆加固、遮阳防冻融、拱部超前小导管预注浆、弱爆破、喷混凝土、监控量测等施工方法在高原冻土区的隧道同样所起的作用,同时介绍了在该段进行防冻害与防排水处理的施工工艺与冻土区地质加固的特殊措施———热棒措施。 On basis of the construction of the ultra-shallow-buried portion of Kunlunshan tunnel of Qingzang railway (from DK977 +600 to DK977 +660), the article describes the effects of the following measures in the tunnel construction: surface consolidation grouting, freezing/thawing prevention by means of sun shading, pregrouting by means of small pipes installed around the tunnel arch, weak blasting, shotcreting and monitoring. Furthermore, the article also describes the freezing/thawing prevention construction techniques, the water-proofing and drainage construction techniques and the technique of thermal rods as specially taken to consolidate the freezing ground.
作者 盘明山
出处 《隧道建设》 2006年第2期68-70,73,共4页 Tunnel Construction
关键词 特浅埋 冻土隧道 防冻害 防排水 热棒措施 ultra-shallow cover tunnel in freezing ground freezing damage prevention water-proofing and drainage thermal rod
  • 相关文献

参考文献1

  • 1[1]TBJ108-92,铁路隧道喷锚构筑法技术规则[S].北京:中国铁道出版社,1995.

同被引文献15

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部