结合工程概况,介绍了锤击管桩施工流程,主要从施工各主要工序过程介绍了高强预应力混凝土管桩锤击法施工、质量控制要点,以确保工程质量。
Combined with general engineering situations the construction process of dynamic compaction pile. From this aspect the construction and quality control key points of dynamic compaction method in construction of high-strength prestressed concrete pipe pile are introduced in order to ensure engineering quality.
出处
《山西建筑》
2006年第10期108-108,153,共2页
Shanxi Architecture
关键词
预应力
混凝土管桩
施工
质量控制
prestress, concrete pipe pile, construction, quality control