摘要
本文就船舶建造周期的模糊性建立了相应模糊网络计划图设计模型,并给出了各工艺阶段周期模糊分布的确定方法,编制了船舶建造模糊网络计划图设计软件。
Based on the fuzzy properties of the shipbuiliding period, a corresponding design model of the fuzzy network plan is set up. A method for determing the fuzzy distribution of the period at each technological stage is given and a design software for the fuzzy network of the shipbuilding plan is also developed.
出处
《船舶工程》
CSCD
北大核心
1996年第4期55-58,3,共4页
Ship Engineering