摘要
本文以湄洲湾火电厂主厂房预应力桩为例,应用我国现行规范和美国规范进行设计验算,对大截面,超长度预应力桩的试桩、检测、参数选择、设计进行了总结。
Taking the example of prestressed pile of the main factory building of Mei - zhou - wan fuel electric plant, this article designs and measures the prestressed pile on the base of the Chinese current norms and American norms , and summaries the pile - testing, measuring, parameter choosing, design of large -section and over -length prestressed pile.
出处
《福建建筑》
2006年第3期114-116,共3页
Fujian Architecture & Construction
关键词
预应力桩
检测
试桩
设计
prestressed pile measuring pile - testing design