摘要
介绍了石油化工工程项目变更的概念、分类以及施工阶段、竣工决算阶段的变更控制。提出工程变更时应注意工程变更的合法性、准确性和时效性,以便控制工程造价。
The concept and classification of work change in petrochemical project implementation and the work change control in construction and project completion stages are described. The validity, soundness and effectiveness of the change should be carefully studied to control the project costs.