摘要
This is a summary in relation to the construction and operation of Tianwan Nuclear Power Station (the Project) at Lianyungang, Jiangsu Province, the People’s Republic of China. The breakdown specialty topic shall been given in times to come. In this report, the author attempted to give some general description of the Project, including the Project site’s general layout and geographical conditions. A description of its exposure to the elements is also provided, supported by some data made available to us. The key component parts of the Project are described, namely, the nuclear island which includes the reactor, steam generator and so on; the conventional island and the balance of plant. Wherever possible, the improvements to the reactor design over the operating V320 are highlighted, which result in the V428 reactor model. The supplier and contractor for the major equipment such as the reactor and the turbine is the Russian company, namely Atomstroyexport (ASE). There are third country suppliers who provide other equipment. For instance, Siemens supplies the full digital I&C system and Framatome ANP supplies the emergency diesel generators; the metal-clad switchgear cabinet by ABB of Australia; the main steam isolation valve unit by CCI AG of Switzerland. All these foreign suppliers are well known globally. Their experience and quality of the equipment supplied by them are well recognized by the people in the respective fields. As for the civil work and erection work, the most experienced and trustworthy local contractors have been selected. These contractors have proven their competence in similar contract work before. For the testing of the equipment, stringent and proper procedures which meet international standards are adopted. Finally, the author wished on this report could provide the world a safety and advanced Nuclear Project building in China.
This is a summary in relation to the construction and operation of Tianwan Nuclear Power Station ( the Project) at Lianyungang, Jiangsu Province, the People' s Republic of China. The breakdown specialty topic shall been given in times to come. In this report, the author attempted to give some general description of the Project, including the Project site' s general layout and geographical conditions. A description of its exposure to the elements is also provided, supported by some data made available to us. The key component parts of the Project are described, namely, the nuclear island which includes the reactor, steam generator and so on; the conventional island and the balance of plant. Wherever possible, the improvements to the reactor design over the operating V320 are highlighted, which result in the V428 reactor model. The supplier and contractor for the major equipment such as the reactor and the turbine is the Russian company, namely Atomstroyexport (ASE). There are third country suppliers who provide other equipment. For instance, Siemens supplies the full digital I&C system and Framatome ANP supplies the emergency diesel generators; the metal-clad switchgear cabinet by ABB of Australia; the main steam isolation valve unit by CCI AG of Switzerland. All these foreign suppliers are well known globally. Their experience and quality of the equipment supplied by them are well recognized by the people in the respective fields. As for the civil work and erection work, the most experienced and trustworthy local contractors have been selected. These contractors have proven their competence in similar contract work before. For the testing of the equipment, stringent and proper procedures which meet intemational standards are adopted. Finally, the author wished on this report could provide the world a safety and advanced Nuclear Project building in China.