东营黄河大桥上部结构施工支架及挂篮关键技术

Key Support and Cradle Technologies in Construction of Dongying Yellow River Bridge Superstructures
下载PDF
导出
摘要 东营黄河大桥主桥上部结构(116+200+220+200+116)m预应力混凝土刚构连续结合梁的箱梁采用菱形挂篮悬臂施工法。介绍了主墩和次主墩0号块施工分别选取的支架方案,以及现浇直线段的支架方案。阐述了挂篮的试压方法,并对其试压结果进行了分析。 Diamond-shaped cradle cantilever construction method is adopted for box girders of the prestressed concrete continuous rigid frame beams in the section of superstruetures ( 116 + 200 + 220 + 200 + 116)m of the main bridge of the Dongying Yellow River Bridge, The paper introduces the support schemes respectively selected for construction of blocks No. 0 of the main pier and secondary main pier and the cast- in- situ straight section. The trial loading method with cradles is explained and its trial loading results are analyzed.
作者 孙晓迈
出处 《铁道建筑技术》 2006年第2期9-12,共4页 Railway Construction Technology
关键词 公路桥 支架 挂篮 施工 highway bridge support cradle construction
  • 相关文献

参考文献1

  • 1GB50017-2003.钢结构设计规范.[S].中华人民共和国建设部,..

共引文献307

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部