杭州湾跨海大桥70m箱梁梁体庞大,采用全液压自动伸缩整体拼装模板进行施工。详细介绍了该模板的底模构造、外侧模构造、内模系统及其现场安装工艺,并总结了该模板的技术创新点。
The whole hydraulic formwork is applied in 70 m prefabricated concrete box beam of Hangzhou Bay Bridge. This Paper discusses the composing of the whole hydraulic formwork and its working principle, especially in structure of formwork, internal formwork system, installation of formwork and summarizes technological innovation of this kind of formwork.
出处
《铁道建筑技术》
2006年第2期41-43,46,共4页
Railway Construction Technology
关键词
全液压模板
模板设计
模板安装
the whole hydraulic formwork
design of formwork
installation of formwork