改良A^2/O工艺的工程实践 被引量:11

Engineering practice of modified A^2/O process
下载PDF
导出
摘要 城市污水处理厂采用多点进水的改良A2/O生物脱氮除磷工艺,取得了较好的脱氮除磷效果。在工艺运行中,通过采取有效的调控措施,保证了生化池脱氮除磷各反应单元的溶解氧要求,得到了较佳的工艺运行参数控制范围。 Multiple-influent modified A^2/O process was used in a municipal wastewater treatment plant, good effect of biological removal of nitrogen and phosphorus was gained. In process operation, dissolved oxygen requirement of each unit in biological reactor was ensured by taking effective adjustment and control measures, and well operation parameter control range was obtained.
出处 《环境污染治理技术与设备》 CSCD 北大核心 2006年第5期132-134,共3页 Techniques and Equipment for Environmental Pollution Control
关键词 改良A2/O工艺 生物脱氮除磷 工艺运行 modified A^2/O process removal of nitrogen and phosphorus process operation
  • 相关文献

参考文献6

二级参考文献11

  • 1徐亚同.废水生物除磷系统的运行与管理[J].给水排水,1994,20(6):20-22. 被引量:11
  • 2SEGRERS ENGINEERING WATER. UNITANK—Advanced treatment of industrial and municipal wastewater, 1996.
  • 3SEGRERS ENGINEERING WATER. UNITANK--Advanced treatment of industrial and municipal wastewater,1996
  • 4G Bortone, S Marsili Libelli,et al.Anoxic phosphate uptake in the Dephanox process. Wat Sci Tech,1999,40(4-5):177~185
  • 5P Cooper,M Day,V Thomas.Process options for phosphorus and nitrogen removal from wastewater.J IWEM,1994,8(2):85~92
  • 6T Kuba,et al. Phosphorus and nitrogen with minimal COD requirement by integration of denitrifying dephosphatation and nitrification in a two-sludge system. Wat Res 1996,30(7): 1702~1710
  • 7J Wanner,et al. New process design for biological nutrient removal. Wat Sci Tech, 1992,25(4-5):445~448
  • 8George A Ekama, Mark C Wentzel. Difficulties and developments in biological nutrient removal technology and modelling.Wat Sci Tech,1999,39(6):1~11
  • 9娄金生,谢水波.提高 A^2/O 工艺总体处理效果的措施[J].中国给水排水,1998,14(3):27-30. 被引量:25
  • 10钱群,朱鸣跃,余荧昌.城市污水生物脱氮除磷技术[J].交通部上海船舶运输科学研究所学报,2000,23(2):129-134. 被引量:8

共引文献190

同被引文献86

引证文献11

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部