摘要 研究了南水北调西线一期工程隧洞运行后的淤积机理及其影响,结果表明,由于水体泥沙以悬移质超细泥沙为主、水土泥沙含量小及隧洞温度等对隧洞影响很大,会加速隧洞的淤积,只有当水的流速达到泥沙启动速度时,泥沙会启动而被水流带走,引水隧洞不会淤积。研究结果对引水隧洞工程实践具有很好的参考价值。 Study on the mechanism of the siltation in the water conveyance tunnel of the Phase I Project of Western Route of South-to-North Water Transfer Project and its effects after the operation is made herein. The results show that the tunnel is greatly affected by the less silt content, which consists mainly of the finest silt of the suspended load, and the temperature of the conveyed water, so the siltation is to be accelerated. The study demonstrates that the tunnel can not be silted only when the water velocity reaches the starting-up velocity of the desihing and the sediment can be carried away. The results provide a better reference to the similar project of water conveyance tunnel.
出处 《水利水电技术》 CSCD 北大核心 2006年第5期18-20,32,共4页 Water Resources and Hydropower Engineering
基金 2005年度河南省高等学校创新人才培养工程项目 2005年度河南省高校杰出科研人才创新工程项目(HAIPURT) 河南省重点科技攻关计划项目"边坡演化过程的非线性理论研究"资助
关键词 南水北调西线一期工程 引水隧洞 淤积 冲刷 Phase I Project of Western Route of South-to-North Water Transfer Project water conveyance tunnel siltation scouring
  • 相关文献

参考文献11

二级参考文献137

共引文献160

同被引文献22

引证文献2

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部