期刊文献+

基于Agent反、正向招投标技术的Job Shop调度研究

Research on the Job Shop Scheduling Based on Backward and Forward Agent Bidding Techniques
下载PDF
导出
摘要 分析了目前基于多Agent技术的Job Shop调度研究所存在的问题,对Job Shop调度问题进行了形式化描述,给出了基于多Agent的总体调度结构和调度过程,提出了基于柔性工艺路线的虚拟制造单元和Agent的反、正向招投标调度机制,描述了具体实现过程,给出了招标、投标、评标的参数和指标,通过示例验证了该方法的有效性。所提方法在Agent招投标中直接考虑了工序任务间的约束和联系,即充分发挥了多Agent系统分散决策的优势,又从根本上避免了任务分配的冲突,提高了调度效率。 Based on analyzing of the problem in current multi - agent based Job Shop scheduling, a general scheduling framework and process is given after formal description of Job Shop scheduling. The virtual manufacturing cell based on flexible job route and backward and forward agent bidding techniques are proposed, and its realization and bidding parameters and criteria are described. The technique proposed is validated through a test - bed problem and proved effective. By taking into account the constraints and relations between working procedures directly in agent bidding, the techniques takes full advantage of multi - agent distributed decision - making and avoids conflicts in task assigning, and scheduling efficiency is improved.
出处 《组合机床与自动化加工技术》 2006年第5期90-93,共4页 Modular Machine Tool & Automatic Manufacturing Technique
基金 国家自然科学基金资助项目(50375043)
关键词 JOB Shop调度 多AGENT 合同网协议 正向招投标 job shop scheduling multi- agent contract net protocol backward and forward bidding
  • 相关文献

参考文献11

二级参考文献25

  • 1刘飞,杨丹,易树平.制造系统理论体系框架及其应用[J].中国机械工程,1996,7(1):43-46. 被引量:17
  • 2蒋新松,张申生.敏捷竞争的挑战与思考[J].计算机集成制造系统-CIMS,1996,2(1):3-9. 被引量:73
  • 3人见胜人.生产系统论--现代生产的技术和管理[M].北京:机械工业出版社,1994.107.
  • 4[1]SHAW J P. The design of a distributed knowledge_based approach for the intelligent manufacturing information system [D]. PhD thesis,West Lafayette, IN:Purdue Univ.,1984.
  • 5[2]UPTON D M. The operation of large computer controlled manufacturing system[D].PhD thesis,West Lafayette, IN: Shool of Industrial Engg.,Purdue Univ.,Dec.1988.
  • 6[3]TILLEY K J,WILLIAMS D J.Modeling of communications and control in an auction-based manufacturing control system[C]. Proc. Of 1992 IEEE Int'l Conf. On Robotics and Automation, Nice, France.
  • 7[4]JAYAMOHAN M S, RAJENDRAN C.New dispatching rules for shop scheduling: a step forward[J].International Journal of. Production Research, 2000,38(3):563-586.
  • 8[5]VEPSALAINEN A P J,MORTON,T E.Priority Rules for job shops with weighted tardiness costs[J]. Management Science,1987,33:1035-1047..
  • 9[6]CARROLL D C.Heuristic sequencing and multiple component jobs[D]. Unpublished PhD dissertation, Massachusetts Institute of Technology, Cambridge, MA.1965.
  • 10[7]BAKER K R,KANET J J.Job shop scheduling with modified due dates[J]. Journal of Operations Management, 1983,4:11-22.

共引文献81

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部