针对富溪连拱隧道中隔墙开裂造成施工停止的事例,提出了富溪连拱隧道进口高仰坡堆积体的防护对策。
In the light of the stoppage of the construction of Fuxi Multi-arch Tunnel caused by the cracks on the partition walls in the tunnel, this paper puts forward some protective measures for the talus with high-slope of the entrance of Fuxi Multi-arch Tunnel.