非承包商责任水利工程赶工补偿费用的编制

Compilation of the Rush-work Compensation Fee of the Hydraulic Engineering with the Responsibility of Non-contractor
下载PDF
导出
摘要 先对非承包商责任状态下,水利工程施工赶工补偿费用编制的依据、费用构成、计算标准和计算方法在理论上进行了探讨,再以某合同项目M7.5浆砌石坝体为例,介绍了赶工补偿费用的具体操作规程。 This paper probes theoretically into the basis, cost composition, calculation standard and calculation method of the preparation of the rush-work compensation fee of the hydraulic engineering under the situation of the responsibility of non-contractor, and taking a certain contract project of M7.Smortar dam as the example, introduces the concrete operating rules of the rush-work compensation fee.
作者 任够平
出处 《科技情报开发与经济》 2006年第8期179-181,共3页 Sci-Tech Information Development & Economy
关键词 非承包商责任 赶工补偿费用 水利工程 responsibility of non-contractor rush-work compensation fee hydraulic engineering