摘要
介绍了为进行大洋多金属结核扬矿模拟试验所建立的计算机自动检测与控制系统的软硬件组成及其计算机数据采集功能。
The author has established a computer automation measuring and control system for the simulation test of lifting ocean multi metallic nodules. the paper describes its softwares and collection function. Its application is also described in the lifting test.
出处
《矿冶工程》
CAS
CSCD
北大核心
1996年第3期8-10,15,共4页
Mining and Metallurgical Engineering
关键词
大洋多金属结核
扬矿试验
参数检测与控制
Ocean multi metallic nodule
Lifting test
Parameter measuring and control