摘要
本文应用数值模拟方法,分析了焦家金矿采用高水固结尾砂充填后采场围岩的稳定性。计算表明,在焦家金矿采用高水固结尾砂充填采场是可行的。
In this article,the stable analysis of the adjoining rock of stope while applying backfilling materials of high water solidified tails in Jiao Jia Gold Mine is made by using numerical simulation method.It shows from calculation that this technology is feasible in this gold mine.
出处
《黄金》
CAS
北大核心
1996年第9期21-25,共5页
Gold
关键词
高水固结尾砂
充填材料
数值模拟
稳定性
金矿
backfilling materials of high water solidified tails
numerical simulation
stability