针对田东电厂6 kV配电室地基下沉、面砖错层的现象进行了原因分析,根据整治技术要求,提出了整治方法和整治实施要点,得出了整治效果显著的结论,从而保证了施工质量和设备的正常安装、调试、运行。
In light of sub-grade setting and wall tile staggering of 6kv power distribution room in Tiandong power plant, the author analyzes its contributing factor, puts forward renovation method and implement essential according to renovation technique requirement, and draws a conclusion of notable renovation effect, which to ensure construction quality and regular installation, setting up and testing and operstion of equipment.
出处
《山西建筑》
2006年第11期96-97,共2页
Shanxi Architecture
关键词
化学灌浆技术
地基
面砖
病害
chemical grouting technique, ground base, wall tile, disease