摘要
结合北京地铁五号线蒲黄榆车站和磁器口车站的施工,介绍了浅埋暗挖法,并对这两个车站结构施工的优缺点进行了比较,以更好地解决好暗挖车站的施工问题,促进地铁的发展。
Combined with practical construction work of Puhuangyu station and Ciqikou station in the No. 5 line subway of Beijing the shallow tunneling method is introduced. The advantages and disadvantages in structural construction of two stations are compared in order to resolve problems encountered in construction and promote the development of subway.
出处
《山西建筑》
2006年第11期107-108,共2页
Shanxi Architecture
关键词
地铁
车站
施工方法
中洞法
subway, station, construction method, center drift method