摘要
结合工程实例,介绍了初次沉淀池的工程概况和施工程序,详细阐述了池底板、池壁、无粘结筋施工技术等主要施工技术措施,最后论述了初次沉淀池的盛水试验和使用情况,可供类似工程参考借鉴。
Combined with practical work and based upon introduction of the general situations and construction process of the work of primary sedimentation pond the construction technology of base plate, pool wall and unbonded prestressed tendon are introduced in detail. In the end the water filling test and service conditions of this sedimentation pond are mentioned, which can be used for references by similar works.
出处
《山西建筑》
2006年第11期134-135,共2页
Shanxi Architecture
关键词
初次沉淀池
预应力筋
混凝土
池壁
primary sedimentation pond, prestressed tendon, concrete, pool wall