摘要
结合工程实例,介绍了架梁的工艺流程,关键施工技术及架梁方案,从架桥机过孔、运梁作业、加梁过程论述了跨既有线预制梁架设施工技术,提出了安全技术措施。
Combined with specific engineering, it introduces process flow,key construction technology and plan of frame beam, discusses construction technology of pre-casting beam which spanning present line from bridge machine passing hole,carrying beam and erecting beam, and puts forward safety measures.
出处
《山西建筑》
2006年第11期333-334,共2页
Shanxi Architecture
关键词
既有线
架梁
运梁作业
present line, frame beam, carrying beam