期刊文献+

120t顶底复吹转炉水模研究 被引量:15

Water model Study of a 120t Top bottom Combined Blowing Converter
下载PDF
导出
摘要 采用水力学模型试验,通过测定熔池均匀混合时间长短,确定复吹转炉底部供气元件最佳位置和供气量.结果是单支底部供气元件偏心布置在炉底耳轴方向0.4D位置,供气量在0.557~0. Optimum position of a bottom tuyere and amount of gas blowing in a combined blowing converter were determined by measurement on perfect mixing time of metal bath via water model experiments. It is shown that the shortest mixing time can be obtained when one tuyere is used and located at the ecentric position of 0 4 D at the bottom of the converter in the direction of its ear axis with bottom gas flows of 0 557~0 928 m 3 N·h -1 .
出处 《东北大学学报(自然科学版)》 EI CAS CSCD 1996年第1期51-55,共5页 Journal of Northeastern University(Natural Science)
关键词 底部供气元件 复吹转炉 水力模型 顶底复合吹炼 perfect mixing time,bottom tuyere,combined blowing converter,water model.
  • 相关文献

参考文献1

  • 1徐文派,转炉炼钢学,1988年

同被引文献62

引证文献15

二级引证文献59

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部