一种车载重负荷作业机械的研究与设计

Research and Design of Heavy Load Work Machine
下载PDF
导出
摘要 随着社会的发展,越来越多的高空作业向机械化发展,特别是电力系统作业.这就需要一种重负荷作业平台来装载机械化工具,而目前的高空作业机械负荷一般在300kg以下,主要是载人工具.而在大型喷浆机器人的基础上改造而成的重负荷作业机械承载能力达2t以上,可以安装2台~3台带电作业机械手,并可以用作其他高空作业平台.该作业机械以汽车发动机为动力,全液压比例控制,具有手柄和无线摇控两种操作方式.可在城市或野外任何地方作业. More and more aerial working takes the way to automatic working with the development of society,especially in electric power domain.It needs a heavy load platform to bear the weight of automatic equipment.But now the loadability of the aerial work machines in use can not exceed 300 kg,which mainly work as tools to carry people.The heavy load work machine redesigned from the big shotcreting robot has the loadability over 2 tons.It can carry tow or three manipulators or work as platform for other works.All movements of the heavy load work machine are driven by hydraulic system gained power from auto engine.Which can be proportional controlled by hand lever or wireless remote manipulator.The heavy load work machine can work in city or anywhere outside city.
作者 荣学文 宋锐
出处 《机械传动》 CSCD 北大核心 2005年第6期72-75,共4页 Journal of Mechanical Transmission
关键词 高空作业 液压系统 机械手 无线遥控 Aerial working Hydraulic system Manipulator Wireless remote
  • 相关文献

参考文献3

二级参考文献9

  • 1樊炳辉,逢振旭,苏学成,李贻斌,杨明.煤矿井下机器人结构设计[J].中国机械工程,1995,6(5):13-14. 被引量:8
  • 2Sawada J, Kusumoto K, Maikawa Y, et al. A Mobile Robot for Inspection of Power Transmission Lines. IEEE Trans on Power Delivery, 1991, 6(1): 309~315.
  • 3Nakashima M, Yano K, Maruyama Y, et al. The Hot Line Work Robot System "Phase Ⅱ " and Its Human-robot Interface"Mos'. In: Proc of the IEEE/RSJ Inter Conf on Intelligent Robots and Systems, Vol 2. 1995. 116~123.
  • 4Yano K, Maruyama Y, Morita K, et al. Development of the Semi-automatic Hot-line Work Robot Systems "Phase Ⅱ ". In;Proc of the 7th Inter Conf on Transmission and Distribution Construction and Live Line Maintenance. 1995. 212~218.
  • 5Santamaria A, Aracil R, Tuduri A, et al. Teleoperated Robots for Live Power Lines Maintenance (ROBTET). In: Proc of 14th International Conference and Distribution, Part 1 Contributions,Exhibition on Electricity Vol3. 1997. 31/1-5.
  • 6Yi H, Jiansheng Co The Research of the Automatic Washingbrushing Robot of 500 kV DC Insulator String. In: Proc of the 6th International Conference on Transmission and Distribution Construction and Live Line Maintenance. 1994. 411~424.
  • 7IEC 61318. Live Working-guidellnes for Quanlity Assurance Plans.
  • 8荣学文,樊炳辉,李云江,江浩.基于改进遗传算法的油缸平衡机构的优化设计[J].中国机械工程,2001,12(5):543-545. 被引量:8
  • 9李云江,荣学文,樊炳辉,江浩.大型隧道喷浆机器人液压系统设计[J].中国机械工程,2001,12(7):735-737. 被引量:15

共引文献60

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部