摘要
针对国内缺少利用定量的系统化方法对项目进行优先级评估以选择最优的项目组合的现状,从战略角度提出了定量化评估方法。论述了该方法应用于项目选择的基本过程,得出了项目选择的一种综合模型。最后,通过具体项目的应用研究得到量化的方案。
According to the situation that there is lack of quantitative synthetic method at home to evaluate project priority for selecting the optimal project combination, a quantitative evaluation method is presented from point of view of strategy. The basic process in which the method is used for the project selection is described and a synthetic model for project selection is obtained. At last, a quantitative method is achieved by means of the practical project application.
出处
《航空制造技术》
2006年第5期98-102,共5页
Aeronautical Manufacturing Technology
基金
航空科学基金资助项目(01J53078)。
关键词
项目选择
优先级
雷达图
决策模型
Project selection Priority Radar plot Decision making model