2Bartak R.Constraint Programming:What is behind?[C].In:Proceedings of CPDC99 Workshop,Gliwice, 1999-06.
3Bartak R.Constraint-Based Scheduling:An Introduction for Newcomers[R].Technical Report TR 2002/2,Department of Theoretical Computer Science and Mathematical Logic,Charles University,2002.
4Dechter R.Network-based heuristics for constraint satisfaction problem[J].Artificial Intelligence, 1987 ;34.
5Philippe Baptiste,Le Pape.Constraint-Based Optimization and Approximation for Job Shop Scheduling[C].In:Proceedings of the AAAISIGMAN Workshop on Intelligent Manufacturing Systems,IJCAI-95, Montreal, Canada, 1995.
7W H M Raaymakers, J A Hoogeveen. Scheduling multi-purpose batch process industries with no-wait restrictions by simulated annealing. European Journal of Operational Research, 2000, 126(1): 131~151
8L A Zadeh. Fuzzy sets. Information and Control, 1965, 8(3): 338-353
9S Chang, Y Yih. A fuzzy rule-based approach for dynamic control of Kanbans in a generic Kanban system. International Journal of Production Research, 1998, 36(8): 2247~2257
10T Chang, Y Yih. Constructing a fuzzy rule system from examples. Journal of Integrated Computer-Aided Engineering, 1999, 6(2): 213~221