期刊文献+

工程装备维修任务分派的模糊决策 被引量:2

A fuzzy decision on maintenance assignment for engineering equipment
下载PDF
导出
摘要 将模糊决策理论引入到工程装备维修任务分派问题中,建立问题的模糊决策模型,提出优化维修任务分派的一种新的决策方法。实例分析表明,该方法可获得良好的效果。 A new method of decision was developed on the fuzzy decision model of maintenance assignment, in which the basic theory of the fuzzy decision was applied. Using the fuzzy decision, get a decision approach to optimal assignment problem. The results showed, the suggested method could result in better effect than present.
出处 《现代制造工程》 CSCD 2006年第5期112-114,共3页 Modern Manufacturing Engineering
关键词 维修 分派问题 模糊决策 Maintenance Assignment problem Fuzzy decision
  • 相关文献

参考文献5

  • 1Baker R D,Christer A H.Review of Delay-Time of Modeling of Engineering Aspects of Maintenance[M].New York:Prentice Hill,1996.
  • 2Danny I Cho,Mahmut Parlar.A Survey of Maintenance Models for Multi-Unit systems[M].New York:Wiley,1991.
  • 3甘应爱 等.运筹学[M].北京:清华大学出版社,1990..
  • 4刘付显,邢清华.预防维修决策分析[J].系统工程与电子技术,2001,23(6):44-45. 被引量:7
  • 5李青,陆廷金,李宁萍,张玉柱.某新型装备维修策略的研究[J].模糊系统与数学,1999,13(2):37-44. 被引量:3

共引文献82

同被引文献13

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部