摘要
本文主要论述化工厂厂房内的较大型进口贵重设备的吊装、就位过程,尤其是该设备在安装、调校前期的工作和具体实施过程中的运作。
The main discussion of this passage is the process of lifting and positioning only for big equipment inthe floor in chemical factory. Particularly the preparing work before equipment installation, and how to enforce during equipment lifting and installation.
出处
《广东化工》
CAS
2006年第5期67-69,共3页
Guangdong Chemical Industry
关键词
厂房楼层内
反应器
吊装
安装
in the floor
NSA-Reactor
lifting
installation