期刊文献+

X公司工时与作业方法研究 被引量:3

The Study of Man-hour and Operation Method in the X Company
下载PDF
导出
摘要 基于流水线不平衡的现状,运用流程作业分析方法对工时定额和作业方法进行了分析,通过测时、工序同期化等工作来调整流水线负荷,规范作业线形图,给出了具体的基于工时定额的装配线作业指导书。通过这些工作,为企业提高生产能力,组织工时定额合理的装配线,提高工作效率提供了途径。 Due to the unbalancing state of current production lines, the workflow analysis method was used for analysis of the standard working time and operational method. In the paper, the production line loads were adjusted and the operational charts were standardized through time measure and process synchronism. Based on the standard man-hour, the assembly line operation instruction was produced. This paper provides an approach to improve production capacity and production efficiency for an enterprise.
作者 李随成 王锐
出处 《工业工程》 2006年第3期116-120,共5页 Industrial Engineering Journal
关键词 工序 工时定额 工序同期化 作业指导书 process standard time synchronism manufacture operation indication
  • 相关文献

参考文献3

二级参考文献1

  • 1林荣瑞.管理技术[M].厦门:厦门大学出版社,1997.338-350.

共引文献10

同被引文献35

引证文献3

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部