查龙水电站位于高海拔严寒的藏北高原,主坝为我国海拔最高的混凝土面板沙砾石坝。本文重点介绍坝体渗流控制,混凝土面板抗冻设计,及新型嵌缝止水材料,面板表面涂料的研究。
Chalong Hydropower Station is located in northern Tibet Plateau with high elevation and severe cold. The main dam is an embankment dam with concrete face slab at the highest elevation in China. Seepage control in dam,design of freezing resistance for concrete face slab, new caulking water sealing material and surface coat on face slab are mainly presented.