摘要
主要介绍AVN2440DS复合式盾构机在全部以零件形式拆除的情况下如何进行组装,在组装过程中主要应注意的细节技术;在地面上如何对液压系统、电气系统、高压空气系统、循环水路系统和注脂注浆系统进行调试工作,并着重讲述推力油缸的调试。
The article describes the assembly method of AVN2440DS shield machine on basis of parts and elements, as well as the technical details of the assembly to which special attention should be paid. Furthermore, the article presents the debugging of the hydraulic system, electric system, compressed air system, circulation water system and grease injection system, which is conducted on the ground surface. The article places its emphasis on the presentation of the debugging of the thrust cyclinders.
出处
《隧道建设》
2006年第B05期40-41,共2页
Tunnel Construction