一种求解机组组合优化问题的降维半解析动态规划方法(英文) 被引量:9

Dimension-Reduced Semi-Analytical Dynamic Programming Approach for Solving Unit Commitment Problem
下载PDF
导出
摘要 提出一种启发式的动态规划改进方法,可以与其他经济调度算法相结合,用以解决多种约束条件下的机组组合优化问题。通过比较各时段负荷及机组参数,剔除各时段下不满足要求的组合状态,从而减少动态规划中的状态点数;根据机组的最小连续运行、停运时间限制,计及机组功率上升、下降速度的约束,剔除了状态点间的无效路径,从而减少了动态规划的路径个数,达到降维的目的;在确定机组启停状态后,再采用解析法进行机组的功率分配,可以大大提高动态规划方法的效率。经算例检验,该算法简单、有效、实用。 A dimension-reduced semi-analytical dynamic programming approach is presented in this paper, which is a modified heuristic dynamic programming approach that could be committed with other economical dispatch arithmetic used to solve the problem of unit commitments with restrictions. This approach eliminates the commitments that can not meet the requirements by comparing loads and units parameters during every period, to reduce the number of statuses in dynamic programming. It also eliminates the invalid paths between statuses considering the restriction of minimum continuous time of on and off, and tamps rates, thereby reducing the number of paths in dynamic programming and attaining the aim of reducing dimensions. After confirming the running or suspended status of units, the approach is used to distribute powers among units, thereby increasing the efficiency of dynamic programming greatly. This arithmetic is proved to be simple, effective and applicable through tests in numeral examples.
出处 《电工技术学报》 EI CSCD 北大核心 2006年第5期110-116,共7页 Transactions of China Electrotechnical Society
关键词 机组组合 半解析 动态规划 降维 Unit commitment, semi-analytical, dynamic programming, dimension-reduced
  • 相关文献

参考文献8

二级参考文献39

  • 1韩学山,柳焯.考虑发电机组输出功率速度限制的最优机组组合[J].电网技术,1994,18(6):11-16. 被引量:88
  • 2赵子臣,相年德,夏清,张伯明.应用启发式与逐步动态规划法进行机组最优组合[J].清华大学学报(自然科学版),1997,37(1):57-60. 被引量:14
  • 3[1]Mount T. Market Power and Price Volatility in Restructured Market for Electricity. Decision Support Systems, 2001, 30(3):311~325
  • 4[2]Beightler C S, Phillips D T, Wilde D J. Foundations of Optimization. Englewood Cliffs (NJ): Prentice Hall, 1979
  • 5[3]WangSJ, Shahidehpour S M, Kirschen D S, et al. Short term Generation Scheduling with Transmission and Environmental Constraints Using an Augmneted Lagrangian Relaxation. IEEE Trans on Power Systems, 1995, 10(3): 1294~1301
  • 6[4]Wang C, Shabidehpour S M. Effects of Ramp-rate Limits on Unit Commitment and Economic Dispatch. IEEE Trans on Power Systems, 1993, 8(3): 1341~1349
  • 7[5]Bellman R. Dynamic Programming. Princeton (NJ): Princeton University Press, 1957
  • 8[6]Xia Qing, Song Yonghua, Zhang Boming, et al. Effective Decomposition and Co-ordination Algorithms for Unit Commitment and Economic Dispatch with Security Constraints.Electric Power Systems Research, 2000, 53(1): 39~45
  • 9[7]Xia Qing, Song Yonghua, Zhang Boming, et al. Dynamic Queuing Approach to Power System Short-term Economic and Security Dispatch. IEEE Trans on Power Systems, 1998,13(2): 280~284
  • 10[8]IEEE Reliability Test System. IEEE Trans on Power Apparatus and Systems, 1979, 98(6): 2047~2054