期刊文献+

弓网监测系统的设计与实现 被引量:5

Design and Implementation of Bow Network Monitoring System
下载PDF
导出
摘要 在追综国外先进的弓网监测技术的同时,自主开发了一套基于嵌入式系统的弓网监测系统,该系统通过检测受电弓与接触网的接触压力和拉出值进而分析弓网运行状况;文章主要介绍了该套系统整体设计方案,对其核心部分??车顶电气测控系统的功能需求与软硬件设计思路作了比较详细的说明;经试验证明,该系统在实验室的高频强磁场干扰、高频振动和高温环境下仍运行稳定可靠且满足实际应用的需求。 While tracing foreign and advanced bow network monitoring technology, a set of bow network monitoring systems is developed on the basis of embedded system independently. The system aims at analyzing the working state of the bow net by testing the pullout value and the contact pressure of electricity bow and contact net. The whole design plan of this system is introduced, and the designing of the software and hardware of the core part is presented. Proved by the experiment, This system runs steadily and satisfies practical application's demands under the laboratory high frequency strong magnetic field disturbance, the high frequency vibration and the high temperature environment.
出处 《计算机测量与控制》 CSCD 2006年第5期600-602,共3页 Computer Measurement &Control
关键词 嵌入式系统 弓网监测系统 单板机 车顶电气测控系统 embedded system bow network monitoring system SBC
  • 相关文献

参考文献4

  • 1Zworld公司.Rabbit200芯片资料[Z].www.Zworld.com.
  • 2赵叔东,刘友梅.韶山8型电力机车[M].北京:中国铁道出版社,2001.
  • 3Labrosse J J.嵌入式实时操作系统-μC/OS-Ⅱ(第2版)[M].邵贝贝,等,译.北京:北航出版社,2003.
  • 4郑宏,叶思敏,孙涛,李勤波,胡豫庆.矿区天然气计量监控管理系统改造设计及实现[J].计算机测量与控制,2002,10(2):98-100. 被引量:2

二级参考文献2

  • 1游定明,等.天然气流量的标准孔板计量方法SY/T 6143-1996[S].北京:中国石油出版社,1996.
  • 2TMS(国际)有限公司 Visual Basic6.0 高级编程[M].北京:北京大学出版社,2000.

共引文献9

同被引文献21

  • 1久须美俊一,彭惠民.接触网故障的自动诊断技术[J].中国铁路,2004(7):61-63. 被引量:2
  • 2刘彦卿,朱飞雄,王章刊.受电弓动态包络线检测[J].铁道机车车辆,2004,24(6):58-60. 被引量:10
  • 3刘芳,王黎,高晓蓉,王泽勇,赵全柯.受电弓与接触网间的接触压力检测研究[J].电力机车与城轨车辆,2006,29(6):19-21. 被引量:17
  • 4Bucca G,Collina A,Manigrasso R,et al.Analysis of electricalinterferences related to the current collection quality in panto-graph-catenary interaction[J].Rail and Rapid Transit,2011,225(F5):483-499.
  • 5Arie Levant,Alessandro Pisano,Elio Usai.Output-feedbackcontrol of the contact-force in high-speed-train pantographs[C]//Proceedings of the 40th IEEE Conference on Decisionand Control,2001:1831-1836.
  • 6Allotta B,Pugi L,Bartolini F.An active suspension system forrailway pantographs:the T2006 prototype[J].Proceedings ofthe Institution of Mechanical Engineers,2009,223(1):15-29.
  • 7深圳市宏晶科技有限公司.STC89C51RC/RD+系列单片机器件手册[OL].www.mcu-memory.com.
  • 8Bucca G,Collina A,Manigrasso R,et al.Analysis of Electri-cal Interferences Related to the Current Collection Quality in Pantograph-catenary Interaction[J].Rail and Rapid Transit,2011,225(F5):483-499.
  • 9Arie Levant,Alessandro Pisano,Elio Usai.Output-feedback Control of the Contact-force in High-speed-train Pantographs[C] //Pro-ceedings of the40th IEEE Conference on Decision and Control.[S.l.] :IEEE,2001,2:1831-1836.
  • 10Allotta B,Pugi L,Bartolini F.An Active Suspension System for Railway Pantographs:the T2006Prototype[J].Proceedings of the in-stitution of Mechanical Engineers,2009,223(1):15-29.

引证文献5

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部