由于年代的变迁,多数古建大殿都不同程度地出现了地基沉陷、软化等现象,给大殿的保护带来诸多难题。通过现场实际考察,设计大殿的整体提升方案,采用建筑物整体顶升技术,在不破坏大殿原有结构的基础上,对大殿进行加固,然后将大殿原地顶升,有效地解决了这些问题。
Different saftenings and subsidences appeared on the foundations of most of ancient main halls as time went on, by which a good many problems were produced for the protections of main halls. Through the practical field investigation, a good plan for solving the problems of the main halls can be designed using building integrally jack-up technique that can reinforce the main halls and jack-up them in-situ without destroying their former structures.