期刊文献+

胶材用量及配合比优化后龙滩大坝稳定及抗裂性能研究

Study on the Stability and the Anti-crack Performances by Temperature Control of Longtan Dam after the Optimization of Cement Amount and Mix Proportion
下载PDF
导出
摘要 混凝土的胶凝材料用量及温控措施直接影响工程质量和造价,结合龙滩大坝工程实际,通过温度应力仿真计算,重点分析胶凝材料用量减少及配合比优化后温度应力和剪应力的变化,得到胶凝材料减少后,大坝的抗剪安全系数仍可满足设计要求,抗裂能力也没有降低的结论。 The cement amount and temperature control measures of concrete will directly affect the quality and cost of the project. In combination with the actual conditions of Longtan Dam Project and on the basis of the simulation calculation of temperature stresses, this paper stresses on the analysis of the changes of temperature stresses and shear stress after the reduction of cement amount and the optimization of mix proportion. The results showed that after the reduction of cement amount, the shear safety coefficient of the dam could satify the requirements of design and the anti-crack performance also do not reduce.
出处 《水力发电》 北大核心 2006年第5期24-26,共3页 Water Power
关键词 胶材用量 配合比优化 仿真计算 温度徐变应力 大坝稳定 龙滩水电站 cement amount optimization of mix proportion simulation calculation temperature creep stress stability of dam Longtan Hydropower Station
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部