摘要
根据实际产状建立了包含41条长大结构面及5条断层的三峡大坝左厂3号坝段和4号坝段联合作用的三维有限元模型,研究了左厂4号坝段对3号坝段深层抗滑稳定安全系数的影响。提出了一个基于三维强度折减有限元法计算结果确定坝基稳定安全系数的实用判定方法,该方法物理意义明确。分析结果表明,4号坝段对提高3号坝段的安全系数有一定的帮忙作用,但作用不大。
3D-FEM computation model included 41 items large structural planes and 5 items faults in the real attitude and distribution in the No.3 dam foundation and No.4 dam foundation of left powerhouse of the Three Gorges Project combined action are created. The safety factor of No.3 dam foundation in deep sliding stability due to No.4 dam foundation combined action is studied A new practical judge method of dam foundation stability safe factor based on 3D-FEM simulation results using strength reduction method is proposed; it has definite physics meaning. It shows that the combining action of No.4 dam foundation can increase the safety factor of No.3 dam foundation; but its effect is small.
出处
《岩土力学》
EI
CAS
CSCD
北大核心
2006年第6期895-898,902,共5页
Rock and Soil Mechanics
基金
国家自然科学基金(No.10202019
10172057)
陕西省教育厅专项基金(No.02JK126
04JK222)资助