模糊一致矩阵方法在公路主枢纽布局方案评价中的应用 被引量:3

Application of Blurry Accordant Matrix in the Distribution Project Evaluation of Main Road Hinge
下载PDF
导出
摘要 公路主枢纽方案评价中,定性因素与定量因素并存,正相关与负相关系数混杂。层次分析(AHP)法,需定量描述各方案每一因素的隶属度值,而这类隶属度值的确定十分困难,并且不可避免的融入较多的主观色彩。模糊一致矩阵法则避开了特征因子矩阵的建立,利用优先关系系数来描述方案间的优劣,在大量定性因素与定量因素并存的决策中成功地避开了隶属度确定。实践证明,采用模糊一致矩阵方法对长春公路主枢纽货运站场布局方案进行优选,效果理想。 The qualitative and quantitative factors are coexisted, the positive and negative correlation are mixed in the appraisement of main road hinge. The AHP method needs describe subjection of every factor, which is difficult to confirm. The blurry accordant matrix keeps away from the characteristic factor matrix while use precedence relation coefficients to describe the project, which can keep away from subjection confirming in the decision-making when there have many qualitative and quantitative factors. As been proved, the method of blurry accordant matrix in the distribution project of main road hinge's freight station in Changchun.
作者 阎岩 陈秀峰
机构地区 青岛理工大学
出处 《交通标准化》 2006年第6期117-119,共3页 Communications Standardization
关键词 公路主枢纽 模糊一致矩阵 优先关系 main road hinge blurry accordant matrix precedence relation
  • 相关文献

参考文献3

二级参考文献4

共引文献65

同被引文献16

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部