期刊文献+

现阶段无法大规模推广现代项目管理模式的几点理由

Studying on why the Modern Patterns of the Project Management Could not be Widely Practiced at Present
下载PDF
导出
摘要 国际上常见的建设工程项目管理模式有DBB、DB、CM、EPC、PM等,在不同的项目管理模式中,建设各方的权利和责任也不一样。建设部于2004年11月16日发布《建设工程项目管理试行办法》,标志着我国建设项目管理与国际接轨迈出了一大步,但由于我国建设工程法律法规体系与国际惯例不一致,投资体制还存在缺陷,建设企业竞争力不强,对现代项目管理模式不熟悉,因此我国现阶段还无法大规模推广现代项目管理模式。 There are common patterns of construction management in the international projects, such as DBB, DB, CM, EPC and PM etc. For different patterns, the rights and liabilities of the partners are also different. The acting regulations for the project management issued on November 16,2004, by the Construction Ministry of P.R.C, marked the milestone for the internationalized of China project management. Due to the following reasons, such as the difference of the law system for the construction to the international practice, some major negatives existing in the system of investment, the weak of the competitiveness for the construction enterprises, being strange to the modern patterns of project management, the modem patterns of the project management could not be widely practiced in China at present.
作者 陈爱民
出处 《工程建设与设计》 2006年第5期16-20,共5页 Construction & Design for Engineering
关键词 项目管理 法律法规 投资体制 建设企业 project management law and regulation investment system construction enterprise
  • 相关文献

参考文献4

二级参考文献1

共引文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部