摘要
介绍了某建设项目部分桥墩采用单柱盖梁,采用悬臂式预应力砼结构及其施工工艺、施工方法与质量控制措施。
The item hands over the buttresses all for single pillar cover beam, the adoption arm type prepare in response to the dint concrete construction, introducing its construction craft and start construction now the method control with quantity the measure.
出处
《工程建设与设计》
2006年第5期81-84,共4页
Construction & Design for Engineering
关键词
预应力砼盖梁
施工工艺
施工方法
质量控制
prestressed concrete cover beam
construction craft
construction method
quantity control