摘要
潮汐河口建闸的关键问题是闸下淤积。在潮汐河口支流口门上建闸,其闸下淤积面貌主要取决于干流主槽的位置,这与在潮汐河口干流上建闸的闸下淤积问题有着本质上的差异。以钱塘江河口支流曹娥江口门建闸为例,应用河床演变分析、动床实体模型和现场冲淤试验预测了曹娥江大闸闸下淤积面貌和淤积速率,为曹娥江大闸的建设提供了科学依据。
Siltation in the downstream area is the key problem of construction of a barrage in tidal estuaries. Siltation features downstream of a barrage built at the mouth of a tributary is mainly conditional on the alignent of the thalweg of the main river, and is essentially different from that in the main river estuary. To cite an instance with the barrage at the mouth of Cao'e River, which is a tributary of the Qiantang Estuary, the siltation rate and features downstream of the barrage are forecasted using fluvial process analyses, movable-bed physical modeling and field sedimentation experiments. It provides the scientific foundation for the construction of barrages.
出处
《海洋工程》
CSCD
北大核心
2006年第2期38-44,共7页
The Ocean Engineering
关键词
闸下淤积
支流建闸
潮汐河口
动床实体模型
现场冲淤试验
siltation downstream of tidal barrage
tributary barrage
tidal estuary
movable-bed physical model
field sedimentation experiment