摘要
通过对千岛湖一号特大桥拱座大体积混凝土的温度实测,得到混凝土温度场数据。根据实测的温度发展规律,在实验室内进行温度匹配养护,测试混凝土的力学性能。实验结果表明,匹配养护的混凝土的强度较标养下早期发展速度快很多,匹配养护的混凝土后期强度趋势发展平缓;弹性模量与强度的发展规律相似。
According to having measured the rule of temperature development, the specimens were cured under matching curing system. Mechanical property of concrete was tested.The experimental result show that increasing rate of the specimens strength under the matching curing system more fast than under the standard curing system, later strength of the concrete specimens under matching curing develop very slowly; also static elastic modulus has the similar rule.
出处
《建筑技术》
北大核心
2006年第6期439-440,共2页
Architecture Technology
基金
国家自然科学基金资助项目(50408016)
关键词
大体积混凝土
温度发展规律
匹配养护
mass concrete
the rule of temperature rise
matching curing