1[2]R.J.Rableo,L.M.Camarinba-Matos,H.Afsarmanesh.Multi-agent-based agile scheduling.Robotics and Autonomous Systems:27(1999)15-28
2[3]Weiming Shen,Douglas H.Norrie.Anagent-based approach for dynamic manufacturing scheduling.In Workshop Notes of the Agent-Based Manufacturing Workshop at Autonomous Agents'98
6Gupta J N D. Heuristics for hybrid flow shops with controllable processing times and assignable due dates. Computers and Operations Research, 2002,29 : 1417 - 1439.
7Pinedo M. Scheduling Theory. Algorithms and Systems. Prentice Hail, 2002.
8Tasgetiren M, Liang Yunchia, Mehmet Sevkli, et al. A particle swarm optimization algorithm for makespan and total flowtime minimization in the permutation flowshop sequencing problem [ J]. European Journal of Operational Research ,2006,177 : 1930 - 1947.
9Liu Shixin,Tang Jiafu,Song Jianhai. Order-planning model and algorithm for manufacturing steel sheets[J]. International Journal Production Eco- nomics ,2006,100 ( 1 ) :30 - 43.
10Lian Zhigang, Gu Xingsheng, Jiao Bin. A similar particle swarm optimization algorithm for permutation flowshop scheduling to minimize makespan [ J ]. Applied Mathematics and Computation, 2005,175 ( 1 ) : 773 - 785.