摘要
本文介绍了石横5号机组第三次大修后由于汽-发接长短轴与汽侧联接不良造成的异常振动的诊断及处理过程,对异常振动特征进行了分析。
This paper introduces the diagnosis and elimintion process of abnormal vibration caused by the poor connection between the turbine -generator connecting short rotor and steam turbine rotor after the third times general overhaul of No. 5 unit in Shiheng power plant, And it analyses the feature of abnormal vibration.
出处
《山东电力技术》
1996年第4期36-38,共3页
Shandong Electric Power
关键词
振动诊断
发电厂
发电机组
Vibration diagnosis eliminatiom measures site balance