期刊文献+

单井工程项目多指标多层次模糊综合评价

Multi-targets and multi-levels fuzzy synthetic evaluation of Single well engineering project
下载PDF
导出
摘要 一项石油单井工程的施工建设涉及到许多方面,本文从单井项目成本、工期、质量、环境影响和安全健康五大方面进行了分析;建立了单井工程项目综合评价指标体系和综合评价模型;给出了指标和权数的确定方法;并运用模糊数学的原理对单井工程项目进行了模糊综合评价,结合单井工程实际进行应用。 A single well petroleum project construction involved so many aspects. This article analysed in five big aspects, which were single well project's cost, the time limit for a project, the quality, the environmental effect and the security health. It established a synthetic evaluation system of the single well engineering project; And we also produced a method to get the index and weight; Moreover in terms of the fuzzy mathematics principle,we gave a fuzzy syrithetic evaluation to the single well engineering project, and applied it in reality.
出处 《内蒙古石油化工》 CAS 2006年第5期189-191,共3页 Inner Mongolia Petrochemical Industry
关键词 单井工程 成本 质量 工期 环境影响 安全健康 综合评价 Single well project Cost Quality Time limit for a project Environmental effect Security health synthetic evaluation
  • 相关文献

参考文献2

  • 1王彩华 宋连天.模糊论方法学[M].北京:中国建筑工业出版社,1988..
  • 2赵焕成等.层次分析法[M].北京:科学出版社,1986.

共引文献54

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部