期刊文献+

基于模糊优化的物流配送路径(MLRP)问题研究 被引量:9

Research on Multi-objective Location Routing Problem Based on Fuzzy Optimization
下载PDF
导出
摘要 研究采用嵌入模糊决策规则的遗传算法(即模糊优化方法)求解物流配送多目标定位-运输路线安排问题(M LRP),重点考虑了时间和运输成本两个目标的M LRP的求解方法.该算法分成3个阶段,首先利用遗传算法对初始种群搜索选择优化配送路径;然后应用配送网络调度算法综合评价来确定配送路径中的关键路径和非关键路径;最后根据模糊决策规则计算其各个调度相应的指标,并对已挑选出来的染色体中的某些位基因进行调整,以提高算法的收敛性.计算机仿真结果证明了将此混合算法用于求解中、小规模物流配送问题的有效性. The fuzzy optimizing method that fuzzy rules are embedded in genetic algorithm (GA) is proposed for solving multi-objective location routing problem(MLRP). The two objectives are focused on time and transportation cost constraints. The algorithm includes three steps. Firstly, the optimal distribution routes are chosen by genetic operation. Secondly, the scheduling algorithm is applied in distribution network in order to determine the key routes or non-key routes, Lastly, the related factors for scheduling are computed by fuzzy rules. Some gene of chosen chromosome is regulated, The convergence of this algorithm is improved, Simulation results show that this algorithm is effective to solve small-scale or medium scale logistics distribution problem.
出处 《控制与决策》 EI CSCD 北大核心 2006年第6期689-692,共4页 Control and Decision
基金 霍英东基金项目(104009) 辽宁省教育厅科学研究计划项目(2004F013) 福建省自然科学基金项目(A0510019) 华侨大学校基金项目 福建省科学计划重点项目(2005R032)
关键词 多目标定位-运输路线安排问题 模糊优化 物流系统优化 遗传算法 Multi-obiective location routing problem (MLRP) Fuzzy optimizing method Logistic systematic optimization Genetic algorithm (GA)
  • 相关文献

参考文献9

二级参考文献42

  • 1蔡延光,钱积新,孙优贤.智能运输调度系统的设计与实现[J].决策与决策支持系统,1996(4):108-114. 被引量:11
  • 2[1]Hellard R B. Project Partnering Principle and Practice. London: Thomas Telford Publications, 1995
  • 3[2]Goldman S, Nagel R, Preiss K. Agile Competitors and Virtual Organizations. New York: Van Nostrand Reinhold, 1995
  • 4[3]Maloni M J, Benton W C. Supply Chain partnerships: opportunities for operations research. Eur J Operational Research, 1997, 101(3): 419~429
  • 5[4]Davis M, D O'Sullivan D. Systems design framework for the extended enterprise. Production Planning and Control, 1999, 10(1): 3~18
  • 6[5]Wang D, Fang S C, Nuttle H L W. Soft computing for multi-customer due-date bargaining. IEEE Trans on SMC Part C: Application and Reviews, 1999, 29(4): 566~57 5
  • 7[6]Elmaghraby S E. Activity Networks-Project Planning and Control by Network Models. New York: John Wiley and Sons, 1977
  • 8[7]Baker K R, Scudder G D. Sequencing with earliness and tardiness penalties: areview. Operations Research, 1990, 38(1): 22~36
  • 9[8]Wang D. Earliness/tardiness production planning approaches for manufacturing systems. Computers & Industrial Engineering, 1995, 28(3): 425~436
  • 10[9]Wang D, Yung K L, Ip W H. A heuristic genetic algorithm for subcontractor selection in a global manufacturing environment. IEEE Trans on SMC Part-C, 2001, 31( 2): 189~198

共引文献99

同被引文献96

引证文献9

二级引证文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部