摘要
论述了计算工期长于目标工期时,以最小的成本增加换取工期加速的方法,并通过实例加以说明。
The method to obtain the speeding of construction period with the minimum increase of cost when the calculated construction period is longer than the targeted construction period was described, and the method was explained through a practical example.
出处
《工程建设》
2006年第3期1-4,41,共5页
Engineering Construction
关键词
网络计划
进度管理
工期
network schedule
progress management
construction period