摘要
结合工程实际情况,通过工期、天气和材料价格3个方面对朝阳桥的施工环境进行了分析,表明其施工环境具有一定的特殊性,通过施工组织安排分析,指出了其施工组织安排存在的问题,对该桥的灌注桩、T梁预制和架设等主要施工环节的施工工艺和质量控制进行了总结。
This paper combines the actual circumstance of construction, analyzes special construction environment of Chao-yang bridge through three aspects of work period, weather and material price. Summary it's construction to organize to design and the quantity control of construction,puts forward the key problems of the construction organize and design.