万州长江二桥隧道式锚碇与钻岩锚组合结构计算分析和设计 被引量:2

Calculation,Analysis and Design of Combined Structure of Tunnel Type Anchorage and Rock Bore Anchor for the 2nd Wanzhou Changjiang River Bridge
下载PDF
导出
摘要 万州长江二桥主桥锚碇采用了隧道式锚碇与钻岩锚组合结构,设计计算采用了三维有限元分析计算和比较,并对钻岩锚及锚碇锚固系统进行了介绍。 The anchorage for the main bridge of the 2nd Wanzhou Changjiang River Bridge is designed as the combined structure of tunnel type anchorage and rock bore anchor. In the calculation and design, the three-dimensional finite element method is used to conduct calculation, analysis and comparison of the combined structure. In this paper, the rock bore anchor and other anchor systems of the structure are described.
作者 江忠贵
出处 《世界桥梁》 北大核心 2006年第2期31-34,58,共5页 World Bridges
关键词 悬索桥 隧道式锚碇 钻岩锚 组合结构 锚固系统 分析计算 suspension bridge tunnel type anchorage rock bore anchor combined struc ture anchor system analysis and calculation
  • 相关文献

参考文献1

  • 1[2]李世煇.隧道支护设计新论[M].北京:科学出版社,1999.

同被引文献16

引证文献2

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部