由于建设工程项目具有庞大、复杂、周期长和相关单位多等特点,因而在工程实施过程中影响工期的因素会有很多,工期延误是经常发生的情况,文章遵循事前控制的原则,探讨了在编写合同时如何起草及分析工期延误与赔偿费条款,从而减少在工程实施过程中发生与之相关的纠纷或争议的频率,并能够将双方不必要的经济损失降低到最低点。
Owing to the features of construction projects, such as hugeness, complexity, long period and many relevant units, there are a lot of factors influencing construction period during the project implementation. Construction period delay is a frequent matter. It is discussed how to draft out and analyze the articles of construction period delay and its compensation as compiling a contract following the pre control principle, in order to decrease the frequency of pertinent dissension and dispute during project implementation and reduce unnecessary economic loss to lowest level for both partners.