期刊文献+

底水油藏水平井水脊高度的计算 被引量:11

Calculation of water cresting height for horizontal well in bottom-water
下载PDF
导出
摘要 开发底水油藏水平井最大的问题就是底水脊进。底水脊进现象的存在制约了水平井的有效开发。该文利用镜像反映和势的叠加原理,给出底水油藏水平井稳定渗流情况下不同时刻和临界条件下底水脊进高度和水脊面距井轴的侧向距离的解析解,同时结合矿场实例给出实际优化水平井最佳井筒位置,其结果和方法对底水油藏水平井油藏工程设计和理论研究具有一定的指导意义。 The biggest problem for a horizontal well in bottom-water reservoir is water cresting, which restricts the hori- zontal well to be developed effectively. By means of image theory and potential superposition principle, this paper presents the analytic solution of water cresting height and lateral distance from wellbore under steady flow, and optimizes the optimum wellbore placement. The results and the method are useful for reservoir engineering design and the theoretical research for horizontal well.
出处 《水动力学研究与进展(A辑)》 CSCD 北大核心 2006年第3期374-380,共7页 Chinese Journal of Hydrodynamics
基金 中国石油天然气集团公司中青年创新基金项目(03E7014)
关键词 底水油藏 水脊 镜像反映 势的叠加 解析解 bottom-water reservoir water cresting image theory potential superposition principle analytic solution
  • 相关文献

参考文献16

  • 1GIGER F M.Analytic 2-D models of water cresting before breakthrough for horizontal wells[R].SPE15378,1989.409-416.
  • 2KRACHER B J,et al.Some practical formulas to predict horizontal well behavior[R].SPE15430,1986,(Oct.).
  • 3CHAPERON I.Theoretical study of coning toward horizontal and vertical wells in anisotropic formations:Subcritical and critical rates[R].SPE15377,1986,(Oct.).
  • 4KUCHUK F J.Pressure transient behavior of horizontal wells with and without gas cap or aquifer[R].SPE17413,1991.86-94.
  • 5OZKAN E and RAGHAVAN R.Performance of horizontal wells subject to bottom water drive[R].SPE18545,1988.
  • 6PAPATZACOS P.Cone breakthrough time for horizontal wells[R].SPE19822,1991.311-318.
  • 7YANG W and WATTENBARGER R A.Water coning calculations for vertical and horizontal wells[R].SPE22931,1991,(Oct.)
  • 8GUO B and LEE R L.An exact solution to critical oil rate of horizontal wells with gas-oil interface dipping[R].SPE23555,1991.
  • 9GUO B and LEE R L.Determination of the maximum water-free production rate of a horizontal well with water-oil-interface cresting[R].SPE24324,1992,(May).
  • 10GUO B and LEE R L.A general solution of gas/water coning problem for horizontal wells[R].SPE25050,1992,(Nov.).

二级参考文献16

共引文献141

同被引文献106

引证文献11

二级引证文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部